Before you build: a PM's technical checklist

The technical decisions to settle, or raise with engineering, before a build starts. You don't plan the techniques (like SQL queries); you plan the decisions they depend on (like what data to capture).

Read top to bottom: each stage depends on the one above. Click a box for detail; tick it once settled.

You decide a product decision you own Raise with eng you flag it, set the requirement and ask; engineering decides how Both you set the rule, engineering builds it